Sacramento International Airport

SCOPE: Over the course of an aggressive five-month Runway Closure Schedule SB installed over 500 new Runway and Taxiway Light Bases and Fixtures, 20,000 LF of encased duct bank, 200,000 LF of Airfield Cable and re-built the ALSF Approach Lighting System. At this same time the West Electrical Vault was upgraded with new Regulators and the Airfield Lighting Control System was updated.

LOCATION: Sacramento, CA
OWNER: County of Sacramento
GENERAL CONTRACTOR: Granite Construction Company